​每日一词 | glare 详解

2026-02-03 05:23 来源:生活常识网 点击:

每日一词 | glare 详解

#头条创作挑战赛#

每日一词 | glare

高中 CET4 CET6 考研

英 [ɡleə(r)] 美 [ɡler]

例句

1. The sun glares in summer, we need to protect ourselves because it shines with very harsh light.

夏天的太阳很耀眼,我们需要保护自己,因为它的光线非常刺眼。

——《牛津高阶英汉双解词典》

2. He didn’t shout; he just glared at me silently.

他并没有喊叫,只是默默地怒视着我。

——《牛津高阶英汉双解词典》

3. The rabbit was caught in the glare of the car’s headlights.

兔子被耀眼的汽车前灯照射着。

——《牛津高阶英汉双解词典》

4. His glasses magnified his irritable glare.

他那怒不可遏的眼神在眼镜片下显得愈发逼人。

——《柯林斯高级英语学习词典》

基本释义

[v.]

1. to shine with a very bright, unpleasant light

2. to look at somebody / something in an angry way

[n.]

3. [uncountable, singular] a very bright, unpleasant light

4. [countable] a long, angry look

[动词]

1. 发出刺眼的光

2. 瞪眼;怒目而视

[名词]

3.(不可数,单数)刺眼的强光

4.(可数)瞪眼;怒视

互动问题

1.这句话中的glare为何意?

These sunglasses are designed to reduce glare.

2.你能否准确翻译出这句话的含义呢?试一试,在留言区写下来吧!

3.你还对哪个词感兴趣,也可以留言告诉我们!